Video Boxes
Pricing Varies. Multiple Options and Products Available.
Beautifully-printed custom, high-quality boxes (paper over board) that autoplay your most powerful video messages.
Video boxes create a winning, unforgettable experience for the person opening them and are amazing upgrades to employee swag and onboarding, VIP client/investor gifts, training materials and sales materials.
Fully-customized video playback experiences with multiple videos and buttons available, extended playback and battery time, and more.
A variety of sizes and customizations available make video boxes the perfect addition to your next activation.
Why We Love Video Boxes
Branded boxes have become more and more popular over the years, allowing brands to create multisensory experiences with their prospects and customers. Video boxes take these experiences to the next level!
Video boxes allow more scalable uses of their content, using video boxes as sales materials, trade show displays, point of sale materials - always reinforcing the same video message.
Video boxes put the most powerful video content in the hands of your highest-value targets, capturing their attention like nothing else.
Product Details: Video Boxes
Popular Products
Standard Collateral Box: One of our most common products, sized to hold a variety of collateral, at approximately 2’ in height. Produced with 5”, 7” or 10” HD screens. These products can hold multiple videos, provide audio playback with a speaker, and seal with magnetic closures. Many customizations available from foam inserts, to designs, to buttons.
Oversized Swag Box: Our most popular oversized video box, typically produced with a stunning 10” HD screen and multiple videos to tell an engaging story. Large enough to hold items from clothing, to water bottles and much more, while providing flexibility for brands to benefit.
Video Cube: Provide a unique experience with a video box that closes with a high-end magnetic system, and includes a standalone video brochure card. Providing a multi-step experience to the person receiving. Sized in a unique and memorable cube shape, these boxes can hold a variety of physical branded items.
Custom Video Boxes and Gift Sets: If you can dream it up, we can almost always make it happen! Video boxes can be highly customized. We’ve worked with clients on amazing projects to create experiences that provide ROI for high-value customers.
Customizations Available
Speak with our team about including the inserted items (branded materials, swag or gifts)
Additional pages / fold-outs
Pockets / Magnetic closures for insert materials
Die-cut designs (including on screen cut-out)
Spot UV Gloss Finish, Gold or Silver Foil available
4/4 Printing to eliminate any white folds visible
Soft Touch or Anti-Scuff finishes available
Expanded memory cards for larger video(s) file size
Extended / additional battery available
Personalized / customized loading screens and/or video uploading
Mailer parcels / options available
Interactive touch screens (available in 7" and 10" sizes) - custom software development required
LED-in-print customizations / options available
Proven Use Cases of Video Brochures, Video Boxes, Video Books and Video Mailers
What to Expect
The SendVideoBrochures.com team is happy to guide you through our efficient planning process, so you can have your video brochures in hand in as few as 3 - 6 weeks! Should you require any assistance, our team is at your service.
Planning:
Identify the style, size and any customizations for your video brochure product.
Review and approve the price quote shared by our team.
Design:
Share your artwork files in the necessary formats, as well as any video files you’d like to include. We’ll create a designed version of your product for review and approval.
Review & Approval:
Next, we'll create a pre-press, or PDF proof of the printed product for you to make any final tweaks and changes as needed.
Once you provide approval, along with a 50% deposit, your project will transition into the production phase.
Production:
Standard product printing and manufacturing typically takes 8-10 business days, while custom products and finishing options may require additional time.
Delivery:
As soon as your video brochures are finalized, we will share images of the products with you, at which point we’ll require the remaining 50% payment prior to shipping.
Once payment is received, the finished products will be shipped immediately from one of our two fulfillment centers.